The good news: in the just barely down position, which usually nets the larges leak we have a bare seep , not even a trickle working its way through the rubber gasket material, We feel that this is good enough, as good as we can hope for. We'll crank down a little harder on the lag bolts and hopefully even that will cease. Actually, I never run with the board in the partially deployed position so I should really never have a leak.
After we put the boat away it's back to scaffolding building. We will have this shop dried in by this next weekend! All the studs have to be replaced and windows have to be framed in. This is really turning into a big job.
So there it is, the siding job so far.
We heading for Florida October 20 to pick up the RV. Things are looking up!
No comments:
Post a Comment